Mandagere Hydel Scheme is a 3.5 MW power
station located downstream of Gorur dam across
River Hemavathy in K.R.Pet taluk of Mandya
district, Karnataka.
Work on the project started in December 2002
and commercial operation of the plant was
effected in September 2004.
|
S A
L I E N T F E A T U R E S |
| Location |
Mandagere
Village, K.R.Pet Taluk |
|
District / State |
Mandya / Karnataka |
|
Development type |
Power plant utilizing drop available in
anicut built across river |
| Installed capacity |
3.5 MW (2 x 1.75 MW) |
|
River Stream / Canal |
River Hemavathi |
| Water conductor system |
Diversion of
water from river to power house through a
1.1 km power canal and released back to
river through a 0.9 km tail race canal. |
|
Penstock |
N.A |
| Turbines |
Horizontal S-Type Full Kaplan |
| Rated Discharge |
30.22 cumecs / Unit |
| Rated Head |
6.8 m |
| Generators |
2 x Synchronous type |
| Power house |
27 m (L) x 25 m(B) x 9 m (H) |
| Commissioned |
September 2004 |
Contact
|
Mr.Nandakumar
Mandagere Village,
K.R.Pet Taluk,
Mandya District .
Karnataka - 571123
INDIA. |
| Telephone |
: +91 08230 264666 /
264931 |
| Mobile |
: 94483 76227 |
| Email |
:
mandagere@bhorukapower.com
|